Grand Carre de Jaude: an exceptional building site of soil treatement by jet-grouting in the middle of a volcano

机译:大卡鲁·德·Jaude:在火山中间通过喷射注浆进行土壤处理的绝佳建筑工地

获取原文

摘要

In the center town of Clermont-Ferrand, the building of real estate complex with 2 basement levels needed complicated substructure works. Because of the special geology and hydrogeology due to the volcano and its filling, the building designers were obliged to find very specific constructive solutions. During the stage of works the perimetral wall has been carried out from metal sheeting piles down a mixing-ground trench. In stage of use this wall has been reinforced by a concrete wall. To assure the bearing capacity, the equilibrium of the deep excavation and the retaining structures during scope of works and scope of services, a 3 meter thick injected bottom with secant jet-grounting columns and jet-grounting load-transfer colomns has been realized. To assure the 3 conditions of soil improving (bearing pressure, watertightness, increase of passive pressure) a specific target in terms of deformation unit, permeability and compression resistance, has been defined during the conception stage. At the begin of works, many testing boards have been used to confirm the type and characteristics for the concrete, diameters, resistance and deformation characteristics of the colomns, according to the types of soils (sandy, slity-clayey with some organic materials…). A program of works follow-up and control (compressive resistance, dilatometer, inclinometer, topography, water test, static loading test…) has been set up during the whole execution stage to achieve the earthworks and all substructure works.
机译:在Clermont-Ferrand的中心镇,建筑拥有2个地下水平的房地产复杂,需要复杂的子结构工作。由于由于火山及其填充,建筑设计师的特殊地质和水文地质,因此有义务找到非常具体的建设性解决方案。在作品的阶段,从混合地沟槽下沿金属板桩进行围绕墙壁。在使用阶段,该墙已由混凝土墙加固。为了确保承载力,深度挖掘平衡和服务范围期间的保留结构,并且已经实现了3米厚的注射底部,具有割割机喷射柱和喷射地装载载荷集团的底部。为了确保在概念阶段期间定义了在概念阶段定义了在变形单元,渗透性和压缩性方面的特定目标的土壤的3种土壤的条件。在作品开始时,许多测试板已被用来确认基团的混凝土,直径,电阻和变形特性的类型和特征,根据土壤的类型(桑迪,碎片,一些有机材料......) 。在整个执行阶段,在整个执行阶段建立了一种工程随访和控制(压缩,膨胀,倾斜计,倾斜计,地形,水试验,静电加载测试......)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号