The Application of Compaction Sand Pile in the Yellow River-Crossing Project for South-to-North Water Diversion

机译:压实砂桩在南水北调黄河穿越工程中的应用

获取原文

摘要

In the construction of Yellow River-Crossing Project for the Middle Route of the South-to-North Water Transfer, the silt, silty sand and fine sand widely exist in the foundation, that it need to be processed in the region where the possibility of sand liquefaction because of the low bearing capacity.We had a detailed study and experiment for the sand compaction pile of the axis and the outside of the channel, and determined the compactness of pile body, pile length and the construction technology through the test.We also debugged the concrete construction parameters such as the amount of filling sand and stone, hoisting height and speed, extrusion times and so on.For these experiments, we attained the purpose of increasing the relative density, preventing sandy soil liquefaction, improving the shear strength of the foundation soil and the bearing capacity of the foundation, so as to reduce the foundation settlement.
机译:在南水北调中线黄河穿越工程建设中,粉砂,粉砂和细砂广泛存在于地基中,需要在可能发生粉尘的地区进行处理。由于承载力低,导致砂土液化。对轴心和通道外侧的压实桩进行了详细的研究和实验,并通过试验确定了桩身的密实度,桩长和施工工艺。还对混凝土的施工参数进行了调试,如填充砂石的量,吊装高度和速度,挤压次数等。为达到这些实验目的,我们达到了增加相对密度,防止砂土液化,提高剪切强度的目的。基础土和基础的承载力,以减少基础沉降。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号