Failure Investigation of Olympic-Sized Swimming Pool

机译:奥运大小的游泳池故障调查

获取原文

摘要

From the beginning of the operation of the Olympic Pool in Tennessee, there were signs of trouble, such as liner bubbles, cloudy water, differential gutter rim level, sand in the bottom of the pool, and dirty filter bags. After eight months of operation, sand could be seen coming out of the inlets and one blister, located approximately in the middle of the pool rose above the water and finally the pool liner tore. In determining the causes of the problem, the subgrade subsidence, pool wall settlement and distortion, and sub-floor pipe damage were considered in this investigation. Laboratory testing and subsurface investigations were performed In this investigation, the mechanism of the failure and the reasons behind the liner bubble were explored and discussed. As described in the paper, it appears that significant fracturing of the sub-floor plumbing due to compression of under-compacted fill caused pipe failure. Knowing the mechanism of the failure helped to sustain the pool and keep it operational.
机译:从田纳西州奥林匹克池的运作开始,存在麻烦的迹象,如衬垫气泡,多云的水,差动排水沟水平,池底部的沙子,脏滤袋。经过八个月的运作后,可以看到沙子出来的入口和一个水泡,位于水池中间的大约在水面上方,最后是泳池衬垫撕裂。在确定问题的原因时,在这次调查中考虑了路基沉降,池壁沉降和变形和落地管道损坏。在这项调查中进行了实验室测试和地下调查,探讨了失败机制以及衬垫泡沫背后的原因进行了探讨和讨论。如本文中所述,由于压缩欠压填充导致管道故障,看起来由于压缩而导致的子地板管道的显着压缩。了解失败的机制有助于维持游泳池并保持运作。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号