首页> 外文会议>ASCE Pipeline Division's international conference >Hiding a 96-Inch Pipeline in Your Neighbor's Backyard
【24h】

Hiding a 96-Inch Pipeline in Your Neighbor's Backyard

机译:在邻居的后院隐藏96英寸管道

获取原文

摘要

When DeKalb County Department of Watershed Management decided to replace a 50-year old raw water transmission main with a new pipeline, the obvious choice for routing of the main was in the same alignment as the existing pipeline. In this case, the existing cross-country alignment had advantages of simpler design, reduced construction cost and almost no traffic disruption. Many lessons learned later, the advantages of the crosscountry alignment were tempered by much greater coordination with hundreds of stakeholders. This experience should offer caution for engineers who may jump at the obvious choice of cross-country easements.Three raw water transmission mains provide the entire water supply for over 750,000 residents in DeKalb County, serving a large portion of the Atlanta, Georgia area. The pipelines traverse a 13,000 foot easement from a raw water pumping station on the Chattahoochee River to the Scott Candler Water Treatment Plant (WTP). The existing pipelines were installed in 1942, 1960 and 1980. A new pipeline was required to alleviate the issues of pipe transient damage, reliability and capacity.The 1960 pipeline was the weakest of the three mains and subject to many ruptures over the years. It was decided to replace the old 48-inch main with a new 96-inch welded steel pipeline, which not only would be more secure but would increase the reliable capacity from 140 mgd to as much as 360 mgd. This will provide all future capacity to the County's water customers for the next 50 years.However, in the past 50 years, the character of the alignment has changed dramatically. What was once a rolling easement in open fields is now home to one of Georgia Power Company's major transmission lines, two large oil pipelines, a sewage treatment effluent pipeline, an apartment complex built over the old mains, and up to 80 individual homeowners who have fenced in backyards over the easement.The project required over four years of easement acquisition, coordination with major utilities, extensive agreements with Georgia Power Company, and two years of permitting from three counties and two new cities. Finally, in 2011, the pipeline was completed with limited construction delays and less than 2 percent change orders.This paper discusses issues that were addressed and lessons learned in construction along complex easements with active stakeholder involvement.
机译:当Dekalb County的流域管理部门决定用新的管道取代50岁的原始水传输主要时,主要的途径选择与现有管道相同。在这种情况下,现有的跨国对齐具有更简单,施工成本降低,几乎没有交通中断的优点。许多经验教训后来,横跨对准的优点是与数百个利益相关者的更大协调。这种经验应为可能跳过明显选择的越野换能力的工程师提供谨慎。三尔布尔布县的居民提供全部供水,为佐治亚州亚特兰大的大部分供应了750,000多名居民。管道穿越了砂淘河上的生水泵站13,000英尺的地役权到斯科特烛水水处理厂(WTP)。现有的管道安装于1942年,1960年和1980年。需要一种新的管道来缓解管道瞬态损坏,可靠性和产能的问题。1960年的管道是三个电源的最弱,多年来受到许多破裂的影响。决定用新的96英寸焊接钢管管取代旧的48英寸主管,这不仅会更加安全,而且会将可靠的容量从140 MGD增加到360 MGD。这将为未来50年提供全县的水客户的所有未来能力。然而,在过去的50年里,对齐的性质已经发生了显着变化。什么是开放领域的滚动垫牌现在是佐治亚电力公司的主要输电线路之一,两条大型石油管道,污水处理污水管道,一座旧电源内置的公寓楼,最多80名独立房主。在后院围绕地役权。该项目需要四年多于四年的地式收购,与主要公用事业的协调,与格鲁吉亚电力公司的广泛协议,以及三个县和两个新城市的两年。最后,在2011年,管道完成,施工延误有限,更改订单数量不到2%。本文讨论了在具有主动利益相关者参与的复杂地役权的建设中所讨论的问题和经验教训。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号