Pipe Collapse in an Amusement Park - Now What Do You Do?

机译:游乐园中的管道坍塌-现在您该怎么办?

获取原文

摘要

Condition assessments of aging infrastructure are important to identify the remaining useful life of a utility's assets and to develop a plan to rehabilitate and/or replace the infrastructure. Jacobs Engineering Group Inc. (Jacobs) assessed and prioritized recommended improvements for 33,000 feet of pipe in the Elm Fork North Interceptor System located in northern Dallas County. A 1,200-foot pipe section through Sandy Lake Amusement Park was given a high priority ranking due to a deteriorated condition. In September 2010, before a design contract for improvements was scheduled to begin, a 40 foot section of the existing 48-inch RCP sewer main collapsed in Sandy Lake Amusement Park, causing a sink-hole which compromised a rail line for the park train ride. The pipe owner Trinity River Authority of Texas completed an emergency repair, and approved a final design contract to move forward with the planned improvements.The park's seasonal schedule and surface features made design and construction scheduling a challenge. This paper provides a summary of the project history which included a rehabilitation study, alignment study and environmental assessment, and final design. The final design presented several challenges and this paper discusses some of the challenges including scheduling, bypass pumping requirements, stakeholder coordination, easement negotiation and acquisition, and design considerations proposed for the project.This paper will also discuss the sensitive nature of the park operation combined with the tight corridor which led to the need to closely consider every detail of the excavation and bypass pumping operation during design.
机译:对老化的基础设施进行状态评估对于确定公用事业资产的剩余使用寿命以及制定修复和/或更换基础设施的计划非常重要。 Jacobs Engineering Group Inc.(Jacobs)对达拉斯县北部的Elm Fork北部拦截器系统中的33,000英尺的管道进行了评估并确定了优先改进的建议。由于状况恶化,穿过桑迪湖游乐园的一条1,200英尺长的管段被给予高度优先等级。 2010年9月,在计划开始进行设计改进合同之前,桑迪湖游乐园的现有48英寸RCP下水道主管的40英尺部分坍塌,形成了一个下沉孔,破坏了公园火车的铁路线。得克萨斯州的三一河管理局(Trinity River Authority)完成了紧急维修工作,并批准了最终设计合同以推进计划中的改进工作。公园的季节性时间表和地表特征使设计和施工计划面临挑战。本文提供了项目历史的摘要,其中包括修复研究,对接研究和环境评估以及最终设计。最终设计提出了一些挑战,本文讨论了一些挑战,包括日程安排,旁路抽水要求,利益相关者协调,地役权谈判和收购以及针对该项目提出的设计注意事项。由于走廊狭窄,因此需要在设计过程中仔细考虑挖掘和旁路抽水操作的每个细节。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号