Miami Thrice; Lanzo, HJ3, and Carbon Fiber Reinforced Polymer, Preempt Catastrophic Line Breaks with Emergency Repairs in Dade County 54-inch and 48-inch PCCP for Drinking Water using (CFRP)

机译:迈阿密三次; Lanzo,HJ3和碳纤维增强聚合物,抢占灾难性线与达德县54英寸和48英寸PCCP的紧急维修使用(CFRP)

获取原文

摘要

One of the more compelling stories being told within today's rehabilitation framework is that of how we are dealing with our aging Potable Water Infrastructure. The existence of deteriorated Large Diameter Pre-stressed Cylinder pipes (PCCP) in water transmission lines throughout the United States represents a liability shared by many municipalities. A vast inventory of late 1970’s and early 1980’s pipe are suspect due to corrosion and pre-stressing wire breaks Our most prolific water authorities and municipalities have entered into a race against time to prevent catastrophic failure and shutdown from occurring in these water transmission lines. A path being followed is to first perform a condition assessment, and then to prioritize a repair schedule for deteriorated pipe. Carbon Fiber Reinforced Polymer (CFRP) systems have increasingly become a reliable technology utilized for internal and external rehabilitation of PCCP and Reinforced Concrete Pipe (RCP). The use of CFRP has proven beneficial to the drinking water industry due to the fact that it can be field applied, avoiding the need for expensive and disruptive excavations. The integrity of CFRP repairs for drinking water pipe relies on: an accurate condition assessment of the host pipe, a transfer of the assessment and design information from the owner to a qualified engineer, a specification that requires qualified and experienced CFRP manufacturers, designers, installers, and inspectors. This paper shall present two separate projects performed for Miami Dade WASD where one such 54-inch and a 48-inch Lock Joint Cylinder pipe system were first non-destructively identified as being defective, then rehabilitated using the HJ3 manufactured CFRP repair system installed by Lanzo Trenchless Technologies.
机译:在今天的康复框架内被告知更引人注目的故事之一是我们如何处理我们的老龄化饮用水基础设施。整个美国水传输线中劣化的大直径预应力圆柱管(PCCP)的存在代表了许多市共享的责任。 1970年代末的一个庞大的库存和1980年代初管具有耐腐蚀和预应力钢丝断裂我们最丰富的水行政主管部门,直辖市已经进入了一个与时间赛跑,以防止灾难性故障和停机从这些水输电线路发生疑因。遵循的路径是首先执行条件评估,然后优先考虑劣化管道的修复时间表。碳纤维增强聚合物(CFRP)系统越来越多地成为用于PCCP和钢筋混凝土管(RCP)的内部和外部康复的可靠技术。 CFRP的使用已经证明有利于饮用水行业,因为它可以是应用的现场,避免需要昂贵和破坏性的挖掘。饮用水管道CFRP维修的完整性依赖于:主管的准确条件评估,从业主到合格的工程师的评估和设计信息的转移,这是一个规格,需要合格和经验丰富的CFRP制造商,设计师,安装者和检查员。本文应当为迈阿密达德WADE执行的两个单独的项目,其中一个这样的54英寸和48英寸锁定接头气缸系统首先是无损识别为有缺陷的,然后使用Lanzo安装的HJ3制造的CFRP修复系统恢复无齿轮技术。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号