Trenchless Installation of 60 inch sanitary sewer using a 72 inch Robbins Rockhead hard rock TBM

机译:使用72英寸罗宾斯Rockhead硬岩TBM进行60英寸下水道的无缝安装

获取原文

摘要

This paper describes the use of a 72 inch Rock TBM to excavate 13,000 psi limestone for jacking540 LF of a 72 inch casing liner and 60 inch carrier pipe for a flat 0.05% sanitary sewer installation in blockyground with high levels of petroleum contamination in Louisville KY.Louisville MSD's Southeastern Interceptor Part B Project’s called for a 25 foot deep tunnel using 7 gage 84 inchdiameter liner plate initial lining with 60 inch Class IV RCP as the carrier pipe installed in a drill and shoot tunnel.Midwest Mole, Inc a subcontractor for MAC Construction & Excavating, Inc. determined that the project could beconstructed more efficiently by jacking 72 inch steel casing behind a Robbins TBM and installing 60 inch HOBASflush reline fiberglass pipe as the carrier.With 7.1 inches of clearance between initial lining and carrier pipe, accurate tunnel excavation was required.Encountering blocky and seamy ground made tunneling challenging.Another complication was high levels of petroleum contamination in the tunnel atmosphere while excavating thelimestone rock. Investigation of the contamination was performed and workers completed the tunnel excavationusing both suction and supply ventilation and supplied breathing air systems for the TBM and haul unit operator.This paper discusses the benefits, risks and considerations of small diameter rock TBM installation of jacked steelcasing with tight clearances between the casing and carrier pipe. The process for tunneling the initial casing liner inthe difficult ground and the carrier pipe installation along with grouting will be described. The efforts required tocontend with the contaminated atmosphere within the tunnel will be described and will include a discussion of howthe hazards were quantified, monitored and mitigated so that the workers could complete the project safely.
机译:本文介绍了如何使用72英寸岩石TBM开挖13,000 psi石灰石进行顶升 540 LF的72英寸套管衬套和60英寸输送管,用于块状区域中0.05%的卫生污水平面安装 肯塔基州路易斯维尔的石油污染水平很高的地面。 路易斯维尔MSD的东南侦察机B部分计划要求使用7英寸84英寸的深25英尺长的隧道 直径为60英寸IV级RCP的衬板初始衬里,作为安装在钻探隧道中的输送管。 Midwest Mole,Inc是MAC Construction&Excavating,Inc.的分包商,确定该项目可能是 通过在Robbins TBM后面顶起72英寸的钢制外壳并安装60英寸的HOBAS来更有效地进行构造 冲洗重衬玻璃纤维管作为载体。 初始衬砌和输送管之间的间隙为7.1英寸,因此需要精确的隧道开挖。 遇到块状和阴暗的地面使掘进工作充满了挑战。 另一个复杂因素是,在挖掘隧道的同时,隧道大气中的石油污染水平很高。 石灰岩。对污染进行了调查,工人完成了隧道的开挖 为TBM和运输单位操作员同时使用吸气,送风和送风系统。 本文讨论了顶升钢小直径岩石TBM安装的好处,风险和考虑因素 套管,在套管和输送管之间留有紧密的间隙。在隧道中隧穿初始套管的过程 将描述困难的地面和输送管的安装以及灌浆。需要付出的努力 应对隧道内受污染的大气进行描述,并将讨论如何 对危害进行了量化,监控和缓解,以便工人可以安全地完成该项目。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号