首页> 外文会议>International conference on pipelines and trenchless technology >Study on the Technology of Trenchless Pipelines Construction and Its Corresponding Impact on Geological Stratum Deformation Modulus
【24h】

Study on the Technology of Trenchless Pipelines Construction and Its Corresponding Impact on Geological Stratum Deformation Modulus

机译:挖沟管道建设技术及其对地质阶层变形模量的影响研究

获取原文

摘要

As a main construction technology, horizontal directional drilling has been widely applied. In this paper, technical principles, technical features, construction methods and present problems at present faced are introduced. Through using horizontal directional drilling technology, good social and economic benefits can be achieved. At the same time, according to existing discontentment and elastic deformation of stratum during the course of drilling under condition of trenchless construction stratum deformation will happen and corresponding mechanical parameters will be weakened. So a new back-analysis of FEM is put forward based on field-measured data. Before and after trenchless construction, the calculated results can reflect the changing law of geological stratum deformation modulus and of course the results not only can be used to assess the impacts on geological stratum brought by trenchless construction, but also can provide theoretical support to pipelines construction.
机译:作为主要的施工技术,水平定向钻井已被广泛应用。在本文中,介绍了技术原理,技术特征,施工方法和目前面临的问题。通过使用水平定向钻井技术,可以实现良好的社会和经济效益。同时,根据在钻井过程中存在的现有的不连续性和地层弹性变形,在钻石建筑地层变形的条件下会发生,并且相应的机械参数将被削弱。因此,基于现场测量数据提出了对FEM的新的反向分析。在开挖施工之前和之后,计算结果可以反映地质阶层变形模量的变化规律,当然,结果不仅可以用于评估由开花结构带来的地质层的影响,还可以为管道建设提供理论支持。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号