首页> 外文会议>IEEE International Conference on Industrial Engineering and Engineering Management >Managing and evaluating different projects in a hospital trough the analytic hierarchy process: Methodology and test case
【24h】

Managing and evaluating different projects in a hospital trough the analytic hierarchy process: Methodology and test case

机译:通过分析层次处理管理和评估医院的不同项目:方法论和测试用例

获取原文

摘要

Nowadays hospitals work in the context with decreasing resources over time, and unfortunately not all the projects can be implemented. For this reasons healthcare area needs tool to decide on which project invest. The current paper has been developed in one of the major hospital in Genoa (Italy): Galliera. The Galliera hospital has a board of directors who need to know the sustainability of the projects. The aim of this paper is to implement a method to measure in a quantitative way the projects sustainability, with an innovative application of the Analytic Hierarchical Process (AHP). This method allows to compare the quantitative and qualitative items of the projects at the same time. These projects are extremely heterogeneous. The authors involved also all the employees having a strategic position in the hospital determining in this way the success of the work as the results show.
机译:如今医院在上下文中工作随着时间的推移而减少资源,遗憾的是,并非所有项目都不能实施。由于这个原因,医疗保健区域需要工具来决定哪个项目投资。目前的论文已在热那亚的主要医院(意大利):Galliera。 Galliera医院有一个需要了解项目可持续性的董事会。本文的目的是实施一种以定量方式测量项目可持续性的方法,具有分析层次过程(AHP)的创新应用。该方法允许同时比较项目的定量和定性项目。这些项目非常异构。作者还涉及在医院中具有战略地位的所有员工,以这种方式在这种方式确定工作的成功作为结果表明。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号