首页> 外文会议>IEEE International Conference on Industrial Engineering and Engineering Management >Scatter search for multi-mode resource-constrained project scheduling problems
【24h】

Scatter search for multi-mode resource-constrained project scheduling problems

机译:分散搜索多模式资源约束项目调度问题

获取原文
获取外文期刊封面目录资料

摘要

In this paper the multi-mode resource-constrained project scheduling problem is considered. Activities are non-preemptable, resources are renewable, and the objective is to minimize the project duration (or makespan). A local search metaheuristic-scatter search is proposed to solve this strongly NP-hard problem. A comprehensive computational experiment is described, performed on a set of instances based on standard test problems constructed by the proGen project generator. The performance of this scatter search algorithm is compared with the performance of other published algorithms for multi-mode resource-constrained project scheduling problem, the results are analyzed and discussed and some conclusions are given.
机译:在本文中,考虑了多模式资源约束项目调度问题。活动是不可抢先的,资源是可再生的,目标是最小化项目持续时间(或MAKESPAN)。建议提出了一个本地搜索的Metaheuristic-Sclast搜索来解决这一强烈的NP难题。描述了一个综合计算实验,在基于Progen Project发生器构建的标准测试问题的一组实例上执行。将该散点搜索算法的性能与用于多模式资源受限的项目调度问题的其他公布算法的性能进行了比较,分析并讨论了结果,并给出了一些结论。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号