首页> 外文会议>IEEE International Conference on Industrial Engineering and Engineering Management >Development and analysis of fuzzy priority rules for scheduling a dynamic job shop production system
【24h】

Development and analysis of fuzzy priority rules for scheduling a dynamic job shop production system

机译:用于调度动态作业商店生产系统的模糊优先规则的开发与分析

获取原文

摘要

This paper focuses on development and analysis of scheduling rules using fuzzy logic for scheduling a dynamic job shop. A discrete-event simulation model is developed for the purpose of experimentation. Six scheduling rules from the literature are incorporated in the simulation model. Three scheduling rules using fuzzy logic approach have been developed and analyzed. The max-min composition method is used for determining the fuzzy priorities. The fuzzy based scheduling rules perform better for mean flow time measure. One of the fuzzy based rules performs better for mean tardiness and percentage of tardy jobs.
机译:本文侧重于使用模糊逻辑来安排动态作业的调度规则的开发和分析。为实验的目的开发了一个离散事件仿真模型。来自文献的六条调度规则在仿真模型中并入。已经开发并分析了使用模糊逻辑方法的三条调度规则。 MAX-MIN组合方法用于确定模糊优先级。基于模糊的调度规则对于平均流量时间来表现更好。基于模糊的规则之一表现出更好的迟到和迟到的工作百分比。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号