East Reservoir Dam is a high-hazard, earthfill embankment located just south of Akron, Ohio that was constructed in the 1820's and 1830's as part of the feeder system for the Ohio and Erie Canal system. The dam is approximately 1,300 feet long, has a maximum height of 25 feet, and lake levels are controlled by two spillways, one uncontrolled 21-foot long weir and one with two 30-inch gates. Portage Lakes Drive runs along the top of the embankment and the crest width is 40 to 50 feet. The embankment was constructed using the natural fine sands at the site and the foundation soils consist of fine sands and silts. In July 2011, several isolated but severe storms crossed the Akron area. The worst of these storms dumped as much as six inches of rain across the region over a 3.5-hour period. Additionally, ODNR had recently solicited a private contractor to perform extensive clearing and grubbing on the downstream embankment face. Due to heavy rainfalls and recent construction disturbance, inspections revealed extensive seepage exiting the downstream slope near the left abutment. Some of the exit points were as high as halfway up the slope. The seepage was clear but, because of the quantity of seepage, ODNR pursued an emergency repair of this embankment section. Tetra Tech mobilized to the site the next day with ODNR representatives. It was decided that a seepage berm was the most cost-effective solution that could be implemented quickly. Tetra Tech designed the seepage berm dimensions using available subsurface information and laboratory testing. Seepage analyses indicated that the relatively high-permeability of the sand embankment resulted in significant flows through the embankment. The berm was designed to mitigate the threat of piping from through-seepage and to reduce the potential for piping from underseepage. ODNR used the local contractor to construct the berm, which took approximately three weeks. No further problems have been noted since the berm was constructed.
机译:东部水库大坝是位于俄亥俄州阿克伦城南部的高危填土路堤,始建于1820年代和1830年代,是俄亥俄州和伊利运河系统的支线系统的一部分。该水坝长约1,300英尺,最大高度为25英尺,湖泊水位由两条溢洪道控制,一条溢洪道控制21英尺长,一条溢洪道带有两个30英寸闸门。 Portage Lakes Drive沿着路堤顶部延伸,波峰宽度为40到50英尺。路堤是在现场使用天然细砂建造的,基础土壤由细砂和淤泥组成。 2011年7月,几场孤立但严重的暴风雨席卷了阿克伦地区。在3.5小时的时间内,这些风暴中最严重的一场在整个地区倾泻了多达6英寸的降雨。此外,ODNR最近还请一家私人承包商对下游路堤面进行大量清理和灌浆。由于暴雨和最近的施工扰动,检查发现左桥台附近的下游斜坡有大量渗流。一些出口高至斜坡的一半。渗漏很明显,但是由于渗漏量大,ODNR对该堤防段进行了紧急维修。第二天,Tetra Tech与ODNR代表一起动员到了该站点。可以确定,渗流护堤是可以快速实施的最具成本效益的解决方案。 Tetra Tech利用可用的地下信息和实验室测试来设计防渗堤的尺寸。渗流分析表明,沙土路堤的较高渗透性导致大量的流量通过土路堤。该护堤的设计旨在减轻渗流对管道的威胁,并减少渗流对管道的潜在影响。 ODNR使用当地承包商来建造护堤,这花费了大约三周的时间。自从建造护堤以来,没有发现其他问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号