LEGAL CHALLENGES TO PERMITTING LOW HAZARD DAM REMOVALS

机译:许可进行低危坝拆除的法律挑战

获取原文

摘要

According to the Association of State Dam Safety Officials (ASDSO) records, Wisconsin had 3653 state regulated dams in 2008, and ninety percent were low hazard dams. In 2002 the Wisconsin Department of Natural Resources (WDNR) had documented 50 dam removals since 1967, but today the WDNR lists the total of Wisconsin dam removals at about 100. The peak of dam removals in Wisconsin has apparently passed with 31 dams removed between 2000 and 2005. While many books and articles have been written about the technical challenges or decision-making processes of dam removals, this paper presents recent legal challenges to owners applying for removal or abandonment permits and contends that permit litigation has contributed to the peaking and subsequent decline of Wisconsin dam removal frequency.Litigation regarding dam removal has shifted12 from relicensing challenges13'14'15'16 supporting dam removals to contested cases challenging dam removal permit approvals. Initially, permit applications were contested for perceived property devaluation and recreational loss, but recent contesters are challenging dam ownership rights, dam roadway usage rights, riprap and geotextiles usage in restoration, and dam maintenance responsibilities (or negligence of it). This paper discusses recent legal challenges for low hazard dams using two case studies including the 2012 Grimh Dam removal (30-foot-high dam with 710 acre-feet of maximum storage) and the 2009 Woodley Dam removal (18-foot-high dam with 140 acre-feet of maximum storage).
机译:根据州大坝安全官员协会(ASDSO)的记录,威斯康星州在2008年拥有3653个州监管大坝,其中90%是低危害大坝。 2002年,威斯康星州自然资源部(WDNR)自1967年以来已记录了50座大坝的拆除,但今天WDNR列出了威斯康星州大坝的拆除总量约为100座。威斯康星州的大坝拆除高峰显然已经过去,而2000年之间拆除了31座大坝和2005年。尽管已经撰写了许多有关大坝拆除的技术挑战或决策过程的书籍和文章,但本文向提出申请拆除或放弃许可证的业主提出了近期的法律挑战,并认为许可诉讼助长了大坝的拆除和后续工作。威斯康星州大坝拆除频率的下降。关于大坝拆除的诉讼已从支持大坝拆除的许可挑战13'14'15'16转变为挑战大坝拆除许可审批的有争议案例。最初,对许可申请进行了争辩,以评估其财产的贬值和娱乐损失,但最近的竞争者正在挑战大坝所有权,大坝道路使用权,翻修中使用的碎石和土工布以及大坝维护责任(或过失)。本文通过两个案例研究讨论了低危害水坝近期面临的法律挑战,其中包括2012年格里姆大坝拆除(最大储水高度为710英呎的30英尺高水坝)和2009年伍德利大坝拆除(最大储水量为18英尺高水坝)。最大存储空间为140英亩-英尺)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号