首页> 外文会议>International conference on electric technology and civil engineering >Research on the Investment and Construction Contract Condition of BT Projects
【24h】

Research on the Investment and Construction Contract Condition of BT Projects

机译:BT项目的投资与施工合同条件研究

获取原文

摘要

As a new type of financing mode, BT (Build-Transfer) mode is increasingly applied in infrastructure projects these years. On one hand, it alleviates the shortage bottleneck of government funds on infrastructure construction. On the other hand, it opens a new investment channel for enterprises. However, BT mode in China is still in its early age, there are no corresponding laws which bring many problems in practice, especially in the selection of contract type, risk allocation and the determination of buy-back program. These are the key issues of the investment and construction contract of BT projects. This paper tries to analyze these problems and give some suggestions accordingly which will promote the universal and standardization of the investment and construction contract of BT projects.
机译:作为一种新型的融资模式,这些年来,BT(Build-Transfer)模式越来越多地应用于基础设施项目中。一方面,它减轻了政府资金对基础设施建设的短缺瓶颈。另一方面,它为企业开辟了新的投资渠道。然而,中国的BT模式仍处于早期时代,没有相应的法律,在实践中带来了许多问题,特别是在选择合同类型,风险分配和回购计划的确定。这些是BT项目投资和施工合同的关键问题。本文试图分析这些问题,并提出了一些建议,这将促进BT项目投资和建设合同的普遍和标准化。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号