首页> 外文会议>International conference on electric technology and civil engineering >Analysis and Treatment of Bearing Bush Overheating of Horizontal Generating Unit in Houchang Power Station, Shuicheng, Guizhou
【24h】

Analysis and Treatment of Bearing Bush Overheating of Horizontal Generating Unit in Houchang Power Station, Shuicheng, Guizhou

机译:贵州市水城水平发电机轴承轴承轴承轴承过热分析与处理

获取原文

摘要

In the commissioning operation, three horizontal generating units in Houchang Power Station were not up to the rated output because of overheating of thrust bearing bush. After finding out the causes and taking effective measures, the design requirement for the bearing bush temperature of generating unit is met when the rate output is available.
机译:在调试操作中,由于推力轴承衬套过热,Houchang电站的三个水平发电机单元不应达到额定输出。在找出原因并采取有效措施后,当速率输出可用时,会满足生成单元的轴承衬套温度的设计要求。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号