首页> 外文会议>International conference on electric technology and civil engineering >Feasibility Study of Fountain Replacing Cooling Tower
【24h】

Feasibility Study of Fountain Replacing Cooling Tower

机译:替换冷却塔的喷泉可行性研究

获取原文

摘要

The paper analyses and studies the feasibility of the fountain which replaces the cooling tower, we think the landscape-type fountain which is used for treating cooling water could not only reduce the electricity consumption of the cooling-water pump and the cooling tower,but also can beautify the environment. Then it sets one of the projects in Anhui, a central air conditioning system as an example, and analyses it. Finally it puts forward the concrete implementation plan of the fountain which can replace the cooling tower.
机译:本文分析并研究了取代冷却塔的喷泉的可行性,我们认为用于处理冷却水的景观型喷泉不仅可以降低冷却水泵和冷却塔的电力消耗,还可以减少可以美化环境。然后它设置安徽省的一个项目,是一个中央空调系统,作为一个例子,分析它。最后,它提出了可以取代冷却塔的喷泉的具体实施计划。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号