Dig that Creek or Tunnel that Creek? Case Study of Crossing San Tomas Aquino Creek with an Inverted Sewer Siphon in Santa Clara, California

机译:挖那条或隧道那溪吗?加利福尼亚州圣克拉拉的倒水虹吸管横穿圣地汤姆斯阿基诺溪流的案例研究

获取原文

摘要

The Walsh Avenue Trunk Sewer project in Santa Clara, CA involved the construction of over 10,000 feet of 24 to 30-inch trunk sewer. The majority of the sewer was installed using traditional open cut construction methods. The trunk sewer crosses San Tomas Aquino Creek using an inverted siphon. The inverted siphon is a twin barrel siphon (15.2-inch each) with a 23.6-inch air jumper. The original design included open cut installation of the legs of the siphon with the creek being crossed using microtunneling. Two-thirds of the way through the design, the design was changed to open cutting the entire crossing. During construction, the Contractor requested to use auger boring to install the upstream and downstream legs of the siphon. Since one of the legs of the siphon is much steeper than typically constructed, this presented construction challenges which will be presented and discussed. The creek was crossed using open cut construction methods.
机译:沃尔什大道干线下水道项目在圣克拉拉,CA涉及建造超过10,000英尺的24至30英寸的树干下水道。使用传统的开割施工方法安装了大部分下水道。干线下水道使用倒虹吸管越过圣托马斯阿基诺溪。倒立的虹吸管是双桶虹吸管(每个15.2英寸),带有23.6英寸的空气跳线。原始设计包括使用Microtunneling的Creek交叉的虹吸腿的开放式安装。三分之二的方式通过设计,设计变为打开整个交叉。在建造过程中,承包商要求使用螺旋钻无聊安装虹吸管的上游和下游腿。由于虹吸管的一条腿比通常构造的陡峭较大,因此将呈现和讨论的施工挑战。使用开口剪切方法越过小溪。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号