首页> 外文会议>Collection Systems Conference >Efficient Asset Management Planning: Condition – Criticality Based Assessments of Western Lake Superior Sanitary District Assets
【24h】

Efficient Asset Management Planning: Condition – Criticality Based Assessments of Western Lake Superior Sanitary District Assets

机译:高效的资产管理计划:条件-基于临界度的西湖高级卫生区资产评估

获取原文

摘要

The Western Lake Superior Sanitary District (WLSSD) implements an annual asset managementcycle to provide continual upkeep of their sanitary sewer interceptor system. WLSSD retainedCDM Smith to develop a condition-criticality based assessment method that is integral to thisannual planning cycle. This condition-criticality approach assesses 1) the likelihood that an assetwill fail (i.e., condition) and 2) the consequence of failure (i.e., criticality). CDM Smithdeveloped ArcGIS-based decision support tools to assist with condition-criticality assessmentsand to optimize the capital and operations / maintenance project development process. WLSSDhas found that this approach and the tools have improved planning efficiency, asset visualization,Board of Director communications and met Capacity Management, Operations and Maintenance(CMOM) requirements.
机译:西湖高级卫生区(WLSSD)实施年度资产管理 周期提供其下水道拦截系统的持续维护。 WLSSD保留 CDM Smith将开发基于条件临界度的评估方法,此方法不可或缺 年度计划周期。此条件关键度方法评估1)资产的可能性 将失败(即条件)和2)失败的后果(即严重程度)。 CDM史密斯 开发了基于ArcGIS的决策支持工具,以协助进行条件严重性评估 并优化资金和运营/维护项目的开发流程。劳工统计局 发现这种方法和工具可以提高计划效率,资产可视化, 董事会沟通并会见了容量管理,运营和维护 (CMOM)要求。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号