首页> 外文会议>IEEE International Conference on Power Electronics, Drives and Energy Systems >Measurement/Evaluation of electrical power demand/losses in wide spread 11/.4 KV distribution system of JNKVV Jabalpur; Maximum Demand controlled by DG set
【24h】

Measurement/Evaluation of electrical power demand/losses in wide spread 11/.4 KV distribution system of JNKVV Jabalpur; Maximum Demand controlled by DG set

机译:JNKVV Jabalpur广泛使用的11 / .4 KV配电系统中的电力需求/损耗的测量/评估; DG设置控制最大需求

获取原文

摘要

As the global researches predicts that the rate of demand of electrical energy is much higher than the rate at which generation capacity addition is practically done. This leaves a huge gap between generation and demand. The fuel reserves for power generation will soon be depleted. The options are either to cut back on energy usage or to find alternative clean fuels. Another solution is that Demand Side Management (DSM) i.e. management of load such a way the energy consumption throughout day near about same, without any compromising of work. But in govt. sectors/Institutes where working hours are 9a.m. to 5p.m, all task performed between these hours. Due to certain load Maximum Demand (MD) crosses the Contract Demand (CD) & it is not possible to shift them the load to another period, DG set is one of the best solutions to run the load & optimize the MD. This paper indicates one of the techniques to shifting the load from utility to DG set to optimize the demand during peak load periods.
机译:正如全球研究预测的那样,电能的需求速率远高于实际完成发电能力增加的速率。这在发电和需求之间留下了巨大的差距。用于发电的燃料储备将很快耗尽。选择要么是减少能源使用,要么是寻找替代的清洁燃料。另一个解决方案是需求方管理(DSM),即负载管理,这样一来,每天的能源消耗几乎相同,而不会影响工作。但是在政府。工作时间为上午9点的部门/机构到下午5点,所有任务都在这两个小时之间执行。由于一定的负载,最大需求(MD)超过了合同需求(CD),并且无法将其转移到另一个期间,因此DG集是运行负载和优化MD的最佳解决方案之一。本文指出了一种将负荷从公用事业转移到DG组的技术,以在高峰负荷期间优化需求。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号