首页> 外文会议>PVP2011;ASME Pressure Vessels and Piping conference >LIFE-CYCLE MANAGEMENT OF PRESSURIZED FIXED EQUIPMENT
【24h】

LIFE-CYCLE MANAGEMENT OF PRESSURIZED FIXED EQUIPMENT

机译:加压固定设备的生命周期管理

获取原文

摘要

Many process plants will continue to operate pressurized equipment well beyond its intended design life. To ensure that the equipment operates safely and reliably requires adoption of an equipment Life-Cycle Management (LCM) process. During equipment design the LCM process requires identification of potential damage mechanisms, and a design that resists or mitigates the damage. For equipment that has been put into operation the LCM process continues with the use of prescriptive or Risk-Based inspection. An evaluation of the in-service inspection results reveals whether any anticipated (i.e., was considered in the initial design) or unanticipated damage has occurred. If the damage is anticipated and within the design limits, the equipment is returned to operation for a period of time that considers the equipment remaining life, with a new inspection at the end of the operational period. If unanticipated damage is discovered the LCM process requires identification of the damage mechanism and a subsequent Fitness-For-Service assessment to facilitate a decision to run as is, or to rerate, repair, or to replace the damaged components. To effectively implement the LCM approach, codes and standards must exist that address each aspect of the process. In addition, ensuring that similar analysis techniques are employed at the time of construction and when conducting in-service assessments requires coordination of the technology integration in these codes and standards. An overview of API, ASME, and other codes and standards is provided together with a discussion of the efforts to integrate technology to support the LCM process.
机译:许多加工厂将继续运行加压设备,远远超出其预期的设计寿命。为确保设备安全可靠地运行,需要采用设备生命周期管理(LCM)流程。在设备设计过程中,LCM过程要求确定潜在的损坏机制,以及抵抗或减轻损坏的设计。对于已投入运行的设备,LCM流程将继续使用规范性检查或基于风险的检查。对在役检查结果的评估揭示了是否发生了任何预期的(即在初始设计中已考虑的)或意外的损坏。如果预计会发生损坏并且在设计限制之内,则将设备重新投入运行一段时间(考虑设备的剩余寿命),并在运行周期结束时进行新的检查。如果发现意外损坏,则LCM流程需要确定损坏机制,并进行后续的“适应性评估”评估,以帮助决定是否按原样运行,重新评估,维修或更换损坏的组件。为了有效地实施LCM方法,必须存在解决过程各个方面的代码和标准。另外,要确保在建造时和进行在役评估时采用类似的分析技术,就需要协调这些规范和标准中的技术集成。提供API,ASME以及其他代码和标准的概述,并讨论了集成技术以支持LCM流程的工作。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号