Shallow slump stabilization using percusion soil nails at Hamelin creek site on Highway 725:02, Peace Region, AB

机译:在AB和平区725:02公路上的Hamelin小河工地上,使用敲击土钉来稳定浅层坍落度

获取原文

摘要

A precast concrete arch culvert was constructed to pass Hamelin Creek under the 24 m high embankment of Highway 725:02 in Northern Alberta. During construction in 2003, several slides occurred on the marginally stable valley slopes. Extensive mitigation works were constructed to stabilize the site, however deep seated slope creep movements continue on the northwest quadrant of the highway embankment subjecting the culvert structure to distress. Rapid downcutting of the streambed upstream of the culvert following construction has also resulted in shallow slumps along the toe of the northwest slope. There was concern that these slumps could retrogress and further destabilize the large deep seated slide. It was therefore necessary to improve the stability of these shallow slumps along the toe of the slope. The method chosen consisted of using "soil nails" to reinforce of the slide mass. The soil nails consisted of 6 m long by 38 mm diameter hollow steel bars that were installed using a percussion and rotary hammer that drove the nails in a 1 m by 1 m pattern. The paper describes the percussion soil nail installation technique and provides details about the installation equipment. The results of soil nail pullout tests and an assessment of the stability improvement is also provided.
机译:在北艾伯塔省725:02高速公路高24 m的路堤下,建造了一个预制的混凝土拱形涵洞,以穿过哈默林河。在2003年的施工过程中,边缘稳定的山谷斜坡上发生了几处滑坡。为了稳定场地,人们进行了广泛的缓解工程,但是,在高速公路路堤的西北象限上,深层的斜坡蠕变运动继续进行,使涵洞结构遭受了破坏。施工后,对涵洞上游的河床进行了快速下挖,这也导致西北坡脚趾出现了浅薄的塌陷。令人担心的是,这些滑坡可能会倒退并进一步破坏大型深空滑道的稳定性。因此,有必要提高这些浅层坍塌沿坡脚的稳定性。选择的方法包括使用“土壤钉子”加固滑动块。土钉由长6 m,直径38 mm的空心钢筋组成,这些空心钢筋使用敲击锤和旋转锤安装,以1 m x 1 m的样式推动钉子。本文介绍了敲击土钉的安装技术,并提供了有关安装设备的详细信息。还提供了土钉拔出试验的结果以及对稳定性改善的评估。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号