首页> 外文会议>Conference on modern technologies in space- and ground-based telescopes and instrumentation II >Wavefront calibration testing of the James Webb Space Telescope primary mirror center of curvature optical assembly
【24h】

Wavefront calibration testing of the James Webb Space Telescope primary mirror center of curvature optical assembly

机译:詹姆斯·韦伯太空望远镜主镜曲率中心光学组件的波前校准测试

获取原文

摘要

The James Webb Space Telescope (JWST) Optical Telescope Element (OTE) consists of a 6.6 meter clear aperture, all-reflective, three-mirror anastigmat. The 18-segment primary mirror (PM) presents unique and challenging assembly, integration, alignment and testing requirements. A full aperture center of curvature optical test is performed in cryogenic vacuum conditions at the integrated observatory level to verify PM performance requirements. Two wavefront calibration tests are utilized to verify the low and mid/high spatial frequency performance of the test system. In this paper the methods and results of the wavefront calibration tests are presented.© (2012) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
机译:詹姆斯·韦伯太空望远镜(JWST)光学望远镜元件(OTE)包括一个6.6米的透明孔径,全反射,三反射镜。 18段主镜(PM)提出了独特且具有挑战性的组装,集成,对准和测试要求。在集成观测台水平的低温真空条件下进行了全孔径曲率中心光学测试,以验证PM性能要求。利用两个波前校准测试来验证测试系统的低和中/高空间频率性能。本文介绍了波前校准测试的方法和结果。©(2012)COPYRIGHT光电仪器工程师协会(SPIE)。摘要的下载仅允许个人使用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号