Microtunneling through a Very Soft Soil Condition-The Contractor's Perspective of a Case History 10 Years Later

机译:在非常柔软的土壤条件下进行微隧道施工-承包商十年后的案例历史

获取原文

摘要

Waikiki Public Bath Force Main Replacement Project consists of 975m of 400mm force main that carries the wastewater from the Public Bath Pump Station to a gravity sewer on the Ala Wai Blvd. This force main transports wastewater underneath Kalakaua Ave upon which some of the most expensive real state in the world are located. This area is the heart of famous Waikiki beach and it is full of beautiful beaches, resorts, five star hotels, shopping, etc. The soil strata in this area can be briefly described as 2.50 to 3.00m deep of beach sand on top of half a meter to one meter of very hard coral ledge on top of very soft layer of silty sand. The N value in this silty sand layer ranges from zero to 8. The original design of the force main was in the beach sand layer, but an old buried wooden bridge was discovered during the preparation for construction that mandated lowering the elevation to be through and underneath the ledge layer.The specified construction method for this project was microtunneling of 650 mm Permalok steel pipe with a 400mm PVC carrier pipe inside the steel pipe. The annular space between the two pipes was grouted with low density grout. Many problems were encountered during the construction phase of this project. This paper is a retrospective review of the project from the contractor's point of view. It covers the design and construction aspects of this project in addition to the encountered problems and the lessons learned from that project.
机译:威基基公共浴力主要替代工程由975米的400毫米力量组成,将废水从公共浴池泵站带到Ala Wai Blvd上的重力下水道。这款力量主要运输废水下面是Kalakaua Ave,世界上有一些最昂贵的真实状态。这遍布着名的威基基海滩的中心地带,充满了美丽的海滩,度假村,五星级酒店,购物等。该地区的土壤层可以简单地描述为2.50至3.00米的海滩沙子在一半的沙滩上一米到一米的非常硬的珊瑚窗口,在非常柔软的粉状砂层上。该粉体层中的n值范围从零到8。力量的原始设计在沙滩上,但在准备施工过程中发现了一座老埋藏的木桥,要求降低高度并通过和在壁架层下面。该项目的规定施工方法是650毫米永久性钢管的Microtunneling,钢管内部有400mm PVC载体管道。两个管道之间的环形空间以低密度的灌浆灌浆。在该项目的施工阶段遇到了许多问题。本文是从承包商的角度对项目的回顾性审查。除了遇到的问题外,它还涵盖了该项目的设计和施工方面,并从该项目中吸取的经验教训。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号