Design and Selection of the Project Scheme of Qing-Tie Oil Pipeline River-Crossing

机译:青铁输油管道过河工程方案设计与选择

获取原文

摘要

Highway, railway, waterway and pipeline are ways to transport oil. The pipeline has irreplaceable superiority, such as high throughput, low energy consumption and low cost. So the pipeline is the artery of energy source of national economy and very important to the development of social economy. When the pipeline is constructed, crossing some rivers is inevitable. If the crossing method and engineering management were unreasonable, the environment will be damaged, especially the pipeline may be destroyed seriously by the third party damage. Recently, the techniques of design, construction and management of pipeline river-crossing have made a great progress in the world. But pipeline river-crossing is still a technical problem, it needs hydrological research and analysis, geological prospecting and scheme selection. Qing-Tie crude oil pipeline locates in the Northeast of China and has been operated 35 years. It crosses 121 rivers. In these rivers, most sections of the pipeline are attacked by water directly because of the covering soil was washed away. Some sections are baring and hanging tens of meters. It is hidden trouble of security of operation. Especially the pipeline crosses Chai River in Liaoning province, it is laid by culvert of stone, once has an accident it can't be remedied. So remaking the crossing project scheme is essential. This paper has introduced the basic situation of Qing-Tie pipeline and Chai River. The stratum description, weather and hydrogeology, earthquake situation and the stability of bank are analyzed and evaluated. Heavy excavation, directional drilling, shield pushing and drilling blasting are compared by merits and drawbacks, construction period and engineering cost. Finally, the directional drilling is considered to be the best. The crossing horizon, embedded point, out point and laying parameters are worked out. The establishment and implementation of the project scheme is reference for the technique of pipeline river-crossing.
机译:公路,铁路,水路和管道是运输石油的方式。该管道具有无可替代的优势,例如高吞吐量,低能耗和低成本。因此,管道是国民经济能源的动脉,对社会经济的发展非常重要。当管道建成时,穿越某些河流是不可避免的。如果穿越方法和工程管理不合理,将会损坏环境,尤其是第三方可能会严重破坏管道。近年来,管道过江的设计,施工和管理技术在世界上取得了长足的进步。但是管道过江仍然是一个技术难题,它需要水文研究和分析,地质勘探和方案选择。青铁原油管道位于中国东北,已经运行了35年。它穿越121条河流。在这些河流中,由于覆盖土壤被冲走,大部分管道直接受到水的侵蚀。一些路段裸露并悬挂数十米。这是操作安全的隐患。特别是该管道穿越辽宁省的柴河,它是由石涵铺设的,一旦发生事故就无法补救。因此,重新设计交叉项目计划至关重要。介绍了青铁管道和柴河的基本情况。对地层描述,天气水文地质,地震情况和河岸稳定性进行了分析和评价。通过优缺点,工期和工程成本对重型开挖,定向钻井,盾构推进和爆破进行了比较。最后,定向钻孔被认为是最好的。计算出交叉点,嵌入点,出点和铺设参数。本项目方案的建立与实施,对管道过江技术具有参考意义。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号