Consequence Estimation for the Herbert Hoover Dike Dam Safety Modification Study Risk Assessment

机译:赫伯特·胡佛堤防大坝安全改造研究风险评估的结果估计

获取原文

摘要

Although a dam failure can have many types of severe consequences, including economic, social, cultural, and environmental, the primary objective of the USACE Dam Safety program is to manage the potential loss of life risk to the downstream public. USACE considers potential life loss separately from economic and other consequences. Given the generally low likelihood of failure for the majority of dams, it is often difficult to justify dam safety modifications based on economic risk (cost/benefit) alone. Yet, the public may still be at higher risk than society is typically willing to tolerate. USACE recently completed a baseline risk assessment for Herbert Hoover Dike (HHD), which included an assessment of the full range of load conditions, system response to those loads, and potential consequences of failure scenarios. Due to the complex nature of the flood characteristics and areas at risk from potential failure of HHD, a state-of-the-art simulation model called LIFESim was applied to estimate life loss associated with potential failure of the dike. LIFESim is a modular, spatially-distributed, dynamic simulation system for estimating potential life loss from natural and dam and levee failure floods that explicitly considers the primary factors that contribute to life loss in a flood situation. LIFESim can be used to provide inputs for dam safety risk assessment and to explore options for improving the effectiveness of a dam owner's emergency plans or a local authority's response plans. LIFESim is the U.S. Army Corps of Engineers (USACE) most rigorous approach for estimating potential loss of life due to dam failure. Although not the primary decision metric for dam safety investments within USACE, economic impacts are an important consideration in the decision making process. For the HHD assessment, direct economic damages, including urban and agricultural damages, were computed using the Hydrologic Engineering Center's Flood Impact Analysis (HEC-FIA) program. Additional economic impacts, including lost benefits, were also computed.
机译:尽管大坝的破坏可能造成许多类型的严重后果,包括经济,社会,文化和环境后果,但USACE大坝安全计划的主要目标是管理下游公众可能遭受的生命损失。 USACE将潜在的生命损失与经济和其他后果分开考虑。鉴于大多数大坝发生故障的可能性通常较低,通常仅凭经济风险(成本/收益)就很难为大坝安全调整辩护。然而,公众可能仍然比社会通常愿意承受的风险更高。 USACE最近完成了针对赫伯特·胡佛堤防(HHD)的基准风险评估,其中包括对各种负载条件,系统对这些负载的响应以及故障场景的潜在后果的评估。由于洪水特征的复杂性和可能遭受HHD破坏的区域,因此使用了一种称为LIFESim的最新模拟模型来估算与堤防潜在破坏相关的生命损失。 LIFESim是一个模块化的,空间分布的动态模拟系统,用于估算自然洪水,大坝和堤防破坏洪水的潜在生命损失,它明确考虑了在洪水情况下造成生命损失的主要因素。 LIFESim可用于为大坝安全风险评估提供输入,并探索提高大坝所有者的应急计划或地方当局的响应计划的有效性的方案。 LIFESim是美国陆军工程兵团(USACE)最严格的方法,用于估算由于大坝破坏而造成的潜在生命损失。尽管不是USACE中大坝安全投资的主要决策指标,但经济影响是决策过程中的重要考虑因素。为了进行HHD评估,使用水文工程中心的洪水影响分析(HEC-FIA)程序计算了直接的经济损失,包括城市和农业损失。还计算了其他经济影响,包括利益损失。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号