Trials and Tribulation of the Oregon Institute of Technology Small-Scale Power Plant

机译:俄勒冈理工学院小型电厂的试验与磨难

获取原文

摘要

This paper provides information on the trials and tribulations Oregon Institute of Technology (OIT) overcame to start producing power on their campus in Klamath Falls, OR. OIT started on their adventure in 2008 to develop a small-scale low-temperature geothermal power plant using its existing geothermal wells. The temperatures of the wells are 192℉ with a maximum flow of 950 gpm. During the course of developing the plant they have encountered many differ aspects of the project from drilling, water rights, Purchase Power Agreement (PPA), interconnection agreement, to incentive forms (Energy Trust of Oregon, Business Energy Tax Credit and Blue Sky grant) that they have never dealt with before. The power plant was completed in February of 2010 and interconnected into the grid in April 2010.
机译:本文提供了有关俄勒冈理工学院(OIT)在俄勒冈州克拉马斯福尔斯(Klamath Falls)的校园中开始生产电力所经受的考验和磨难的信息。 OIT从2008年开始他们的冒险之旅,利用其现有的地热井开发小型的低温地热发电厂。孔的温度为192°C,最大流量为950 gpm。在开发工厂的过程中,他们遇到了项目的许多不同方面,从钻井,水权,购电协议(PPA),互连协议到激励形式(俄勒冈州的能源信托,商业能源税收抵免和蓝天补助金)他们从未处理过的。该电厂于2010年2月建成,并于2010年4月并入电网。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号