首页> 外文会议>International conference on pipelines and trenchless technology;ICPTT 2011 >Monitoring Technology in Permafrost and Geotechnical Regions of MoHe-DaQing Pipeline
【24h】

Monitoring Technology in Permafrost and Geotechnical Regions of MoHe-DaQing Pipeline

机译:漠河—大庆管道多年冻土区及岩土工程监测技术

获取原文

摘要

MoDa pipeline is constructed from Mohe to Daqing since 2009, with 933 km length and 32 inch diameter. This Pipeline is operated by Petrochina Pipeline Company. It is the first completely buried oil pipeline constructed within the continuous and discontinuous permafrost zone of China where the average temperature in winter is about -30°C. This pipeline will transport roughly 300 thousands barrels of crude oil per day to northern markets of China from January 1st, 2011. It's a significant cooperation for both Russia and China. This paper will review the design, construction, and operational challenges of this pipeline. Analyses the happen possibility of frost heave/thaw settlement and slope instabilities in specific areas. Although traditional methods already were careful coincided, such as minimize thermal disturbance to the soil during construction, insulating permafrost slopes to minimize post-construction thaw, accommodating ground movement, and evaluating the effects of moving water bodies adjacent to the pipeline right-of-way, monitoring technology is still significant methods which include using thermostats sensors to monitor soil temperatures, using Brag liber sensors to monitor material strain, using special displacement instrument to monitor frost heave and thaw settlement, Of course, the use of in-line inspection tools will be valuable as a supplement to conventional geotechnical monitoring. According to these monitoring technical and data been selected, The relationship between pipe and soil have been made out for specific sites in order to assess the potential for frost heave thaw settlement and slope movement, and also include if this generated strains in the buried pipeline exceed the strain capacity. All these consequence will be significant for the integrity management of this pipeline. In the end of this paper, several suggestions will be given to guidance next management work.
机译:MoDa管道自2009年以来从漠河至大庆建成,全长933公里,直径32英寸。该管道由中石油管道公司运营。这是中国连续和不连续的多年冻土带中建造的第一条完全埋藏的石油管道,冬季的平均温度约为-30°C。从2011年1月1日起,该管道每天将向中国北方市场输送约30万桶原油。这对俄罗斯和中国都是重要的合作。本文将回顾该管道的设计,建造和运营挑战。分析特定地区霜冻/融化沉降和边坡不稳定性发生的可能性。尽管已经小心地重合了传统方法,例如在施工过程中将对土壤的热干扰降至最低,对多年冻土坡面进行隔热处理以最大程度地减少施工后的融化,适应地面运动,并评估与管道通行相邻的水体的移动带来的影响,监控技术仍然是重要的方法,包括使用恒温器传感器监控土壤温度,使用Brag liber传感器监控物料应变,使用专用位移仪器监控霜冻和融化沉降,当然,使用在线检查工具会作为常规岩土监测的补充,具有很高的价值。根据这些监测技术和数据,选择了特定地点的管道和土壤之间的关系,以评估霜冻融化沉降和斜坡运动的可能性,并且还包括在地下管道中产生的应变是否超过应变能力。所有这些后果对于此管道的完整性管理将是重要的。在本文的最后,将提出一些建议以指导下一步的管理工作。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号