Reconstruction of the Harpeth River Bridges

机译:重建哈佩斯河大桥

获取原文

摘要

On the weekend of May 1~(st) and 2~(nd) ,2010, Kingston Springs, TN and surrounding area near Nashville received nearly 15 inches of rain. This set-off a chain of inland flood events that shattered historic records. CSX Transportation's Bruceton Subdivision running due west from Nashville experienced the brunt of the storm. Miles of track were washed out and several structures were missing or severely damaged. Two bridges crossing the Harpeth River near Kingston Springs were almost completely washed away in the rising flood waters. One of these bridges located at railroad MP 00F 17.4 was a 199'-0" long three (3) span deck plate girder bridge on curved track alignment. The 66'-4" spans, intermediate piers, and hundreds of feet of approach roadway embankment were swept downstream during the storm. The other structure located at MP 00F 23.5 was a 296' long three (3) span deck plate girder bridge. One of the three 96' spans and hundreds of feet of approach roadway embankment were washed away. CSX Transportation mobilized their emergency response team making site assessments, taking an inventory of available materials, and developing a preliminary plan. By May 4~(th) a preliminary plan was forged and construction crews mobilized to begin reconstructing the two structures. Working in unison, the CSX / HDR engineering team performed expedited on-site surveys, geotechnical investigations, and environmental coordination to finalize design drawings within 3 days of their initial site assessment. The final design consisted of two (2) refurbished 80' steel spans, one (1) new 35' steel span, and two (2) recently fabricated 49' steel spans. The new foundations were precast concrete caps welded onto three (3) large diameter concrete filled pipe piles, which were cored into rock. The well choreographed construction activities allowed for an accelerated schedule and for the bridges to be restored to service within 21 days of the storm.
机译:在2010年5月1日至2日的周末,田纳西州金斯顿温泉和纳什维尔附近的周边地区降雨接近15英寸。这引发了一系列内河洪水事件,打破了历史记录。 CSX Transportation的Bruceton Subdivision从纳什维尔向西行驶,遭受了这场风暴的冲击。数英里的跑道被冲刷掉,几座建筑物丢失或严重损坏。在不断上升的洪水中,横跨金斯普林斯温泉附近的哈珀斯河的两座桥梁几乎被完全冲走。这些位于MP 00F 17.4铁路上的桥梁之一是199'-0“长的三(3)跨跨甲板板梁桥,位于弯曲的轨道对准线上。66'-4”跨距,中间墩和数百英尺的引道暴风雨期间,路堤被清扫到下游。 MP 00F 23.5处的另一个结构是296'长的三(3)跨跨甲板板式大梁桥。三个96'跨度和数百英尺的引道路堤之一被冲走。 CSX Transportation调动了他们的应急响应小组进行现场评估,清点可用材料并制定初步计划。到5月4日,已制定了初步计划,并动员了施工人员开始重建这两个结构。 CSX / HDR工程团队协同工作,进行了快速的现场勘测,岩土工程勘测和环境协调,以在初次现场评估后3天内完成设计图纸的定稿。最终设计包括两(2)个翻新的80'钢跨度,一(1)个新的35'钢跨度和两(2)个最近制作的49'钢跨度。新的基础是将预制的混凝土盖焊接到三(3)个大直径的混凝土填充管桩上,然后将其打入岩石中。经过精心编排的建筑活动可加快进度,并在暴风雨后21天内恢复桥梁的使用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号