NJ TRANSIT'S Raritan Valley Line (RVL) carries 27 trains and more than 27,000 passengers daily over two historic commuter rail bridges at Park and Watchung Avenues in Plainfield, NJ. Replacement of the two 100-year-old bridges provided each bridge with a new main roadway span, bordered on each side by new sidewalk spans, and higher vertical under-clearance. NJ TRANSIT and HNTB selected an innovative Accelerated Bridge Construction (ABC) technique using Self-Propelled Modular Transporters (SPMTs) and a roll-in/roll-out replacement method. SPMTs use multi-axle platforms operated through state-of-the-art, computer-controlled systems, and are capable of pivoting 360 degrees to lift, carry and set large, heavy loads. Key factors determining the decision to use the roll-in/roll-out method included: 1. New bridges could not be built alongside on temporary bents due the given the close proximity of the bridge location to local businesses and the high volume of traffic on each roadway. 2. With both bridges directly adjacent to Plainfield Station, one bridge located at each end of the station platforms, staging construction by switching tracks between structure bays was not viable. 3. SPMTs allowed the majority of demolition and construction to take place at an off-site staging area. 4. SPMTs enabled the ability to precisely time the switch-out to coincide with railroad operations and to minimize impact to the surround community. Each bridge was replaced and operating in one weekend - compared with the traditional method which would have taken weeks or months. The contractor finished its portion of the work with a few hours to spare during each weekend outage, allowing NJ TRANSIT more time to get the tracks and signals back up and running before the Monday morning commute.
机译:NJ Transit的Raritan Valley Line(RVL)携带27列火车,每天有27,000多名乘客,在普莱德菲尔德公园的公园和普通州普通州的两个历史的通勤轨桥上。更换两座100岁的桥梁为每个桥梁提供了一个新的主道路跨度,每侧边界跨越新的人行道跨越,垂直透露率更高。 NJ Transit和HNTB采用了一种采用自推进式模块化运输机(SPMT)的创新加速桥梁结构(ABC)技术和滚动/滚出替代方法。 SPMTS使用通过最先进的计算机控制系统操作的多轴平台,并且能够枢转360度以提升,携带和设置大的重载。确定使用滚入/推出方法的决定的关键因素包括:1。新的桥梁不能在临时嘴段旁边建立,因为桥梁位置靠近桥梁位置到当地企业和大量交通量每条巷道。 2.与普莱德菲尔德站直接相邻的两个桥梁,一个桥位于站平台的每一端,结构托架之间的开关轨道的分级施工不可行。 3. SPMTS允许大部分拆除和建筑在非现场分期区域进行。 4. SPMTS使能力精确时间与铁路操作重合并最大限度地减少对环绕界的影响。每个桥都在一个周末更换和操作 - 与传统方法相比,这些方法将占星数周或几个月。承包商在每个周末停电期间完成了几个小时的工作部分,允许NJ过境更多时间来获得轨道和信号备份并在星期一上午通勤前运行。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号