BNSF Alliance Intermodal Facility Expansion: A large-scale improvement at a critical system facility

机译:BNSF Alliance Intermodal Facility扩展:关键系统设施的大规模改进

获取原文
获取外文期刊封面目录资料

摘要

In the fall of 2013, BNSF Railway began planning a major expansion of Alliance Intermodal Facility in Haslet, TX in anticipation of a substantial increase in intermodal traffic over several successive years. The scope of the expansion would ultimately include $60 million in improvements which nearly doubled the production track capacity, added 60 acres of new pavement, and moved approximately one million cubic yards of earth. The project included a unique set of challenges, including U.S. Army Corps of Engineers permitting, the involvement of several BNSF Railway business units and engineering design disciplines, and coordination and phasing of construction within an active major facility which required the close interaction of engineers, BNSF project managers and operations personnel, and construction managers throughout the duration of the project. This paper will focus on the planning, permitting, design, and construction approach of a major capital expansion project within an active and critical intermodal facility on the BNSF system. Key points in the process included: A) regular, fluid coordination of project requirements with design progress, B) coordination of completed design with construction personnel, and C) coordination and phasing of construction activities with the facility operations personnel. Ensuring effective interaction between all stakeholders in each phase of the project was crucial to the project's success, and this paper will provide a case study of the design and construction of a large-scale intermodal project and the importance of this coordination throughout the process to optimize productivity of both construction and terminal operations.
机译:在2013年秋季,BNSF铁路开始规划HASLET中联盟多式联运设施的主要扩展,以期在几年内预期大幅增加的多式联运。扩张的范围最终包括6000万美元的改进,这几乎加倍的生产轨道能力,增加了60亩的新路面,并迁移了大约100万立方米的地球。该项目包括一系列独特的挑战,包括美国陆军工程兵团,许可,若干BNSF铁路业务部门和工程设计学科的参与,以及在积极的主要设施内的协调和阶段,需要工程师,BNSF的密切互动项目经理和运营人员,以及整个项目期间的建筑管理人员。本文将重点关注在BNSF系统上的主动和关键的多式联合实用化中主要资本扩展项目的规划,允许,设计和施工方法。该过程中的重点包括:a)规范,流体协调项目要求与设计进展,b)与建筑人员的完工设计协调,以及C)与设施运营人员的建设活动协调和阶平。确保项目各阶段的所有利益攸关方之间的有效互动对项目的成功至关重要,本文将提供对大型多式联运项目的设计和建设以及整个过程中该协调的重要性的案例研究建筑和终端运营的生产力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号