首页> 外文会议>International conference on the damaged ship >DEALING WITH THE HINGED SHIP - A REVIEW OF THE ANALYTICAL AND PRACTICAL ISSUES BASED UPON THE M.T. ELLI SALVAGE
【24h】

DEALING WITH THE HINGED SHIP - A REVIEW OF THE ANALYTICAL AND PRACTICAL ISSUES BASED UPON THE M.T. ELLI SALVAGE

机译:处理铰链船 - 基于M.T的分析和实际问题审查。 elli salvage.

获取原文

摘要

In August 2009, south of Suez, the MT Elli broke her back in calm water while being ballasted in preparation for drydocking. The hull girder hinged near amidships and the deformation, about 22m, was sufficient for the bottom of the hull to clear the water. This paper outlines the subsequent salvage and some of the analytical issues in salvaging such a hinged ship including; modelling the geometry, estimating the moment distribution and how it got there, problems with predicting hinge behaviour, estimating residual strength. The practical issues in straightening the ship and subsequent separation into two parts in preparation for removal are discussed.
机译:2009年8月,苏伊兹南部,Mt Elli在镇静的水中突破了她的镇压,以准备干燥。在船上附近铰接的船体梁和变形约22米就足以让船体的底部清除水。本文概述了随后的救助和挽救了这样一个铰链船的一些分析问题,包括;建模几何形状,估计矩分布及其在那里的情况下,预测铰链行为的问题,估计残余强度。讨论了剪裁船舶和随后分离成两部分以准备去除的实际问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号