According to the practical backgrounds of the repairable spare parts in the weapon equipment of the PLA, the multi-echelon inventory model with twoindenture was constructed in this paper. In the mathematical model, the minimum value of expected backorders under the constraint of support budget was used as optimizing objective, and the model was analyzed by the simulation of practical instance.
展开▼