【24h】

Transmission system congestion alleviation with consideration of bilateral contracts

机译:考虑双边合同的输电系统拥堵缓解

获取原文

摘要

This paper proposes a transmission congestion management by load shedding scheme altogether with adjustment of the transformer's tap in the bilateral contract market. In this paper, it is assumed that an independent system operator (ISO) controls all transactions occurring in the system. It can curtail some transactions in case there exists a congestion problem in the power system, either voltage level violation or line overload. In the bilateral market, there is a special characteristic that is different from typical other power systems. When ISO curtails load, at the same time, it must consider reducing the generation of that transaction at the same amount. The proposed transmission congestion management method is based on the linearization and the quadratic programming techniques. It has been tested with the IEEE-RTS79 system. Satisfactory results were obtained.
机译:本文提出了一种通过减载方案和调整双边合同市场中变压器抽头的输电拥塞管理方案。在本文中,假定一个独立的系统操作员(ISO)控制系统中发生的所有事务。万一电力系统中出现拥塞问题(电压水平违规或线路过载),它可以减少某些事务。在双边市场中,有一个不同于典型其他电​​源系统的特殊特性。当ISO减少负载时,它必须同时考虑减少相同数量的事务的产生。所提出的传输拥塞管理方法是基于线性化和二次规划技术的。它已通过IEEE-RTS79系统测试。获得满意的结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号