首页> 外文会议>2011 4th International Conference on Logistics >The infuence of production systems in postponement make-to-stock compagny in the graphic industry
【24h】

The infuence of production systems in postponement make-to-stock compagny in the graphic industry

机译:生产系统对图形业延期入库公司的影响

获取原文

摘要

The supply chain management, postponement and demand management operations are of strategic importance to the economic success of organizations because they directly influence the production process. The aim of this paper is to analyze the influence of the postponement in an enterprise production system with make-to-stock and with seasonal demand. The research method used was a case study, the instruments of data collection were semi-structured interviews, document analysis and site visits. The research is based on the following issues: Demand Management which can be understood as a practice that allows you to manage and coordinate the supply chain in reverse, in which consumers trigger actions for the delivery of products. The Supply Chain Management is able to allow the addition of value, exceeding the expectations of consumers, developing a relationship with suppliers and customer's win-win. The Postponement strategy must fit the characteristics of markets that require variety of customized products and services, lower cost and higher quality, aiming to support decision making. The production system make-to-stock shows enough interest to organizations that are operating in markets with high demand variability.
机译:供应链管理,推迟和需求管理操作对于组织的经济成功具有战略重要性,因为它们直接影响生产过程。本文的目的是分析按库存生产和季节性需求的企业生产系统中延迟的影响。使用的研究方法是案例研究,数据收集的工具是半结构化访谈,文档分析和现场访问。该研究基于以下问题:需求管理可以理解为一种实践,它使您可以反向管理和协调供应链,其中消费者触发产品交付操作。供应链管理能够实现增值,超出消费者的期望,与供应商建立关系,并实现客户的双赢。推迟策略必须适合那些需要各种定制产品和服务,成本更低,质量更高的市场特征,以支持决策。生产系统按库存生产对在高需求可变性市场中运作的组织显示出足够的兴趣。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号