An optimization model for the control of complex turnkey projects in plant engineering

机译:工厂工程中交钥匙工程控制的优化模型

获取原文

摘要

Turnkey plant projects are endeavors which are characterized by high complexity and system dynamics. The application of special methods and models in the project management processes of planning and monitoring & controlling has become a competitive advantage in turnkey plant business. Special attention has to be given to the identification and evaluation of changes and disturbances as those could have severe impacts on the project`s objectives. The selection and implementation of proper control measures becomes crucial to ensure successful projects. In this paper a novel approach for modeling the interdependencies of engineering activities is presented. The approach particularly addresses planning information and changes that will limit the effects of control measures in the case of possible delays. The modeling approach offers decision support by providing a holistic basis for the evaluation of changes.
机译:交钥匙工厂项目是一项以高复杂性和系统动态性为特征的工作。在计划,监控和控制的项目管理过程中使用特殊的方法和模型已成为总包工厂业务的竞争优势。必须特别注意对变更和干扰的识别和评估,因为这些变更和干扰可能会对项目目标产生严重影响。选择和实施适当的控制措施对于确保项目成功至关重要。在本文中,提出了一种对工程活动的相互依赖性进行建模的新颖方法。该方法特别针对计划信息和变更,这些信息和变更将在可能的延误情况下限制控制措施的效果。建模方法通过提供整体基础来评估变化,从而提供决策支持。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号