As part of a potable water reservoir project for the Metropolitan Water District ofSouthern California, Layfield Environmental Systems fabricated and installed aflexible geomembrane defined sump floating cover system. On this project Layfieldoperated as the general contractor with a scope of work that included removing andreplacing the existing floating cover and installing a new 65,000 m2 (700,000 ft2)floating cover system. The project also included an additional 28,000 m2 (300,000ft2) of a chafer reinforcement material around the perimeter of the floating cover, rainwater removal pumps, upgrading of the existing electrical systems, installationof drain pipes, mechanical work and the design and operation of a temporary watertreatment facility.This project encountered some serious installation challenges including a tight 180day installation schedule as this was a critical reservoir with an operational capacityof 130.4 hectares (326 acre feet) providing treated water to Riverside and San DiegoCounties. A special consideration on this project was the requirement to capture allwater that was collected from the construction site. This included the design andoperation of a temporary water treatment facility as the Regional Water QualityBoard had set strict discharge limits on the water released from the site. The watertreatment plant was designed to capture nuisance chemicals or contaminants inrainwater as a result of construction.There was also major water leakage of up to 1,135 litres (300 gallons) per minuteat the influent and effluent gates requiring continuous pumping and dewateringstrategies throughout the duration of the project. The project was further challengedby excessive poor weather as part of an El Nino year in California. This paperdiscusses the various technical challenges and the innovative design and projectmanagement solutions incorporated to help finish the project on schedule.
机译:作为大都会水域饮用水水库项目的一部分 南加州雷菲尔德环境系统公司制造并安装了一套 灵活的土工膜定义的集水槽浮式覆盖系统。在这个项目上 作为总承包商运营,其工作范围包括搬迁和 更换现有的浮动盖并安装新的65,000平方米(700,000平方英尺) 浮动盖系统。该项目还包括另外28,000平方米(300,000 ft2)的金龟子补强材料围绕浮动盖的周围,下雨 除水泵,现有电气系统的升级,安装 排水管,机械工程以及临时水的设计和运行 治疗设施。 该项目遇到了一些严峻的安装挑战,其中包括180 天的安装时间表,因为这是一个具有运行能力的重要水库 130.4公顷(326英呎)的土地为Riverside和圣地亚哥提供经处理的水 县。此项目的一个特殊考虑是要求捕获所有 从施工现场收集的水。这包括设计和 运营临时水处理设施作为区域水质 董事会对现场排放的水设定了严格的排放限制。水 污水处理厂旨在捕获有害化学物质或污染物 由于施工而产生的雨水。 每分钟最大漏水量高达1,135升(300加仑) 在需要连续抽水和脱水的进水口和出水口 在整个项目期间的策略。该项目进一步受到挑战 由于加利福尼亚州发生了厄尔尼诺现象,天气恶劣。这篇报告 讨论各种技术挑战以及创新的设计和项目 包含管理解决方案以帮助按时完成项目。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号