The overvoltage phenomena due to three-phase reclosing of shunt compensated extra high voltage (EHV) transmission lines are analyzed and verified by PSCAD/EMTDC simulation. The study made in an actual 500 kV AC transmission system considers three alternatives in order to limit overvoltages during line reclosing: a developed synchronous switching method, the use of circuit breakers with pre-insertion resistors and the use of metal oxide surge arresters at both line ends. The developed synchronous switching method detects the first minimum region of the voltage beating across the circuit breakers after protection dead time and works independently of zero voltage crossing, reducing significantly the overvoltages and reclosure time. The study was realized taking the line length as an independent parameter.
机译:通过PSCAD / EMTDC仿真分析和验证了并联补偿超高压(EHV)输电线路的三相重合闸引起的过电压现象。在一个实际的500 kV交流输电系统中进行的研究考虑了三种选择,以限制线路重合闸期间的过电压:已开发的同步开关方法,在断路器中使用带有预插入电阻器的断路器以及在两条线路上使用金属氧化物电涌放电器结束。所开发的同步开关方法可在保护空载时间后检测断路器两端跳动的第一个最小区域,并且独立于零电压交叉工作,从而显着减少了过电压和重合闸时间。以线长为独立参数实现了该研究。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号