首页> 外文会议>2011 International Conference on Multimedia Technology >Analysis construction method of double-decked electric power tunnel
【24h】

Analysis construction method of double-decked electric power tunnel

机译:双层电力隧道分析施工方法

获取原文

摘要

With the development of modern technology and space, more and more cities begin exploit underground space, to satisfy the increasingly crowded environment. This article base on double-decked electric power tunnel of 220KV II cut change project, use the finite element software MIDAS/GTS analysis and simulation the project construction process of two different method, through all the simulation of construction process, and analysis the engineering the feasibility construction method. It is the first time use the double-decked tunnel construction methods in Beijing, to discuss and analysis the method of the project have an important significance, in the meanwhile, it can provide some references to similar project construction.
机译:随着现代技术和空间的发展,越来越多的城市开始利用地下空间来满足日益拥挤的环境。本文基于220KV II型改建工程的双层电力隧道,使用有限元软件MIDAS / GTS分析和模拟两种不同方法的项目施工过程,通过对施工过程的全部仿真,并对工程进行了分析。可行性建设方法。这是北京首次采用双层隧道施工方法,对工程方法进行讨论和分析具有重要意义,同时也可为类似工程的施工提供参考。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号