首页> 外文会议>2011 International Conference on Remote Sensing, Environment and Transportation Engineering >Risk control of Shared-Savings projects in energy management contract
【24h】

Risk control of Shared-Savings projects in energy management contract

机译:能源管理合同中节能减排项目的风险控制

获取原文

摘要

In Shared-Savings EMC projects, EMCo bears almost all the risks, including those of external environment, energy-saving technology, marketing, organization and management, and customer. Therefore, Risk prevention and risk management is especially important for EMCo. This article analyzes the features of Shared-Savings EMC's risks, apply subjective grading method to make a qualitative analysis, and apply analytical hierarchy process to make a quantitative analysis in the risk evaluation stage. Finally, the paper will combine these two methods to measure the main risk sources in every stage of an EMC project.
机译:在Shared-Savings EMC项目中,EMCo承担了几乎所有风险,包括外部环境,节能技术,市场营销,组织和管理以及客户的风险。因此,风险预防和风险管理对于EMCo尤为重要。本文分析了Shared-Savings EMC风险的特征,在风险评估阶段应用主观分级方法进行定性分析,并应用层次分析法进行定量分析。最后,本文将结合这两种方法来衡量EMC项目每个阶段的主要风险来源。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号