首页> 外文会议>2011 International Conference on Remote Sensing, Environment and Transportation Engineering >The new method to predict the early productivity of ultra-low permeability reservoir in Ordos Basin
【24h】

The new method to predict the early productivity of ultra-low permeability reservoir in Ordos Basin

机译:预测鄂尔多斯盆地超低渗透油藏早期产能的新方法

获取原文

摘要

There are many and complex factors that affect the productivity in low-permeability reservoir well, from considering the contribution to which, total effective reservoir thickness, reservoir permeability and porosity are main factors affecting well productivity of hua-qing area in the Ordos Basin. The relationship between these factors and the productivity is a nonlinear system, so, this paper researched and derived on the BP neural network model and its algorithm, and used this model to seek the relationship between productivity and influencing factors. The results confirmed that this method is reliable to predict well productivity and can be used to predict the early well productivity of ultra-low permeability reservoirs.
机译:从低渗储层的影响因素来看,影响有效储层总厚度,储层渗透率和孔隙度的主要因素是影响鄂尔多斯盆地华清地区油井产能的主要因素。这些因素与生产率之间的关系是一个非线性系统,因此,本文对BP神经网络模型及其算法进行了研究和推导,并利用该模型寻找了生产率与影响因素之间的关系。结果证实,该方法可可靠地预测油井产能,可用于预测超低渗透油藏的早期油井产能。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号