首页> 外文会议>2011 International Conference on Electric Technology and Civil Engineering >Measurement on soil deformation and numerical simulation during tunneling process
【24h】

Measurement on soil deformation and numerical simulation during tunneling process

机译:隧道掘进过程中土体变形的测量与数值模拟

获取原文

摘要

During the tunnel construction, the soil loss and construction methods cause the soil deformation around the tunnel. The existed constructions and pipes are terribly affected by soil deformation. Hence, the significant studying on the soil displacement is implemented during tunneling construction. On the background of Hangzhou Metro Line1, the in-site monitoring is implemented to find the discipline of the soil deformation development. The numerical method is applied to simulate the tunneling process, and the results meet the discipline of monitoring data. The conclusions are consulted for soil deformation prediction during the tunnel construction.
机译:在隧道施工期间,土壤损失和施工方法导致隧道周围的土壤变形。存在的结构和管道受土壤变形的严重影响。因此,在隧道施工期间实施了对土壤位移的重要研究。在杭州地铁线路1背景下,实施了现场监测,以找到土壤变形发展的学科。应用数值方法来模拟隧道过程,结果符合监测数据的学科。隧道施工期间土壤变形预测征询了结论。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号