首页> 外文会议>Annual technical conference of the North American Society for Trenchless Technology >20/20 REVIEW OF PRE-QUALIFICATION AND DESIGN ASPECTS OF THE CITY OF CALGARY 15 STREET SIPHON TUNNEL PROJECT
【24h】

20/20 REVIEW OF PRE-QUALIFICATION AND DESIGN ASPECTS OF THE CITY OF CALGARY 15 STREET SIPHON TUNNEL PROJECT

机译:20/20审查卡尔加里城市的资格预审和设计方面15街街道隧道项目

获取原文

摘要

The 15 Street Sanitary Sewer Siphon Upgrade is a 300 m long twin 1,650 mm diameter crossing of the Bow River just east of downtown Calgary, and is the first tunneled pipeline under the River in over 90 years. Construction of the project commenced in early 2008 and was successfully completed and put into operation in July of 2010. Drawing on the lessons learned during construction, this paper examines two aspects of the project: 1) Contractor Pre-Qualification and 2) Geotechnical Baseline Report (GBR). The Pre-Qualification process yielded eight contractors who qualified in one or more of the three permitted methods - tunneling, microtunneling and open shield pipe jacking. The suitability of the Pre-Qualification response categories relative to construction is examined. The performance of the GBR is reviewed from two perspectives: 1) influence on the bid phase and 2) how it served the Owner and Contractor during the construction phase.
机译:15街卫生下水道Siphon升级是300米长的Twin 1,650毫米直径的弓河,位于卡尔加里东部的弓河,是河下的第一个隧道管道,超过90年。该项目的建设于2008年初开始,并于2010年7月成功完成并投入运营。论施工期间汲取的经验教训,研究了项目的两个方面:1)承包商预资格和2)岩土基准报告(GBR)。资格预审过程产生了八名承包商,其中三种允许方法中的一个或多个 - 隧道,微管和开放式屏蔽管顶。研究了预验证响应类别相对于施工的适用性。 GBR的表现是从两个观点审查的:1)对投标阶段的影响和2)在施工阶段期间如何在所有者和承包商中服务。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号