首页> 外文会议>2011 International Conference on Consumer Electronics, Communications and Networks >Research on hydration heat temperature field in mass concrete side wall of large water pump station
【24h】

Research on hydration heat temperature field in mass concrete side wall of large water pump station

机译:大型水泵站大体积混凝土侧壁水化热温度场研究

获取原文

摘要

Based on the monitored data during construction of a thick concrete side wall of a deep foundation in Shanghai Qingcaosha Raw Water Engineering, the development of hydration heat temperature field and its detailed distribution were studied. The biggest temperature difference between inside and outside of the structure occurred about 3 days after the concrete was cast, when hydration heat in the core completely released and core temperature began to fall. This temperature difference then narrowed till the end of concrete curing. After 3 days, the non-uniform temperature distribution and general descending of temperature usually cause surface and through cracks. It's proved by the monitored data that concrete curing with surface maintenance is effective in reducing the influence of environment temperature field on that of the concrete, thus beneficial to the control of temperature crack. At last, some suggestions were put forward for the control of temperature stress in mass concrete.
机译:基于上海青草沙原水工程深层基础厚混凝土侧壁施工过程中的监测数据,研究了水化热温度场的发展及其详细分布。结构的内部和外部之间最大的温差发生在混凝土浇筑后约三天,此时芯中的水化热完全释放,芯温度开始下降。然后,该温差变窄直至混凝土养护结束。 3天后,温度分布不均匀和温度普遍下降通常会引起表面裂纹。实测数据表明,采用表面养护的混凝土养护对降低环境温度场对混凝土的影响有效,有利于控制温度裂缝。最后提出了控制大体积混凝土温度应力的一些建议。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号