首页> 外文会议>2011 IEEE International Conference on Industrial Technology >Hoist Scheduling for multi-part CHSP in complex lines' configuration
【24h】

Hoist Scheduling for multi-part CHSP in complex lines' configuration

机译:复杂生产线配置中多部分CHSP的提升调度

获取原文

摘要

The performance of an enterprise largely depends on the schedule of its resources. A good schedule may increase the output rate and reduce the production costs. Therefore, in this paper, we consider the cyclic schedule of hoist activities in automated electroplating lines which is commonly known as Cyclic Hoist Scheduling Problem (CHSP). The CHSPs appear in the manufacturing facilities to achieve a mass production and to search a repetitive sequence of moves for the hoist. In such kind of lines, hoist is used for moving electroplates through a line of tanks containing chemical baths. In this paper, we extend our elaborated 2-degree cyclic linear model to a more complex configuration of the production lines.
机译:企业的绩效在很大程度上取决于其资源计划。良好的时间表可以提高产出率并降低生产成本。因此,在本文中,我们考虑了自动电镀生产线中提升活动的周期性时间表,这通常称为循环提升计划问题(CHSP)。 CHSP出现在制造工厂中,以实现批量生产并为起重机寻找重复的移动顺序。在这种类型的管线中,升降机用于使电镀板移动通过包含化学浴池的管线。在本文中,我们将精心设计的2度循环线性模型扩展到生产线的更复杂配置。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号