Calculating critical degree of the path in a project network with fuzzy activity duration

机译:计算活动持续时间模糊的项目网络中路径的临界度

获取原文

摘要

In traditional CPM/PERT technique, activity duration must be represented either as crisp number or as random variable drawn from certain probability distribution. However, it is usually difficult to define and estimate precisely the operation time for each activity in a real situation. Based on the liner programming and Zadeh's extension principle, this paper presents a method for measuring critical degree of the path in a project network with fuzzy activity times. In the last, this paper uses matlab language to program, and verifies its feasibility and simplicity by an example.
机译:在传统的CPM / PERT技术中,活动持续时间必须以清晰的数字或从某些概率分布中得出的随机变量来表示。但是,通常很难在实际情况下精确定义和估计每个活动的操作时间。基于线性规划和Zadeh的扩展原理,本文提出了一种在活动时间模糊的情况下测量工程网络路径临界程度的方法。最后,本文使用matlab语言进行编程,并通过实例验证了其可行性和简便性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号