Evaluation, Inspection, and Rehabilitation of a Major Storm Sewer in the City of Aurora, Colorado

机译:科罗拉多州奥罗拉市主要雨水管道的评估,检查和修复

获取原文

摘要

In 2007, ICON Engineering, Inc. began a project with Aurora Water to investigate and evaluate a large diameter corrugated metal pipe (CMP) outfall system in the City of Aurora, Colorado. Initial phases of the project focused on comparing the existing hydraulic capacity with the expected discharges from the urbanized watershed and evaluating the structural integrity of the pipe. Subsequent phases included the design and construction of a relining system. In order to accomplish the project tasks and goals, a variety of methods were utilized including: dynamic SWMM analysis of the storm sewer; robotic and hands-on pipe inspection; and final design where relining was completed within the existing CMP system.The City Center outfall system was constructed in 1974 and ranges in size from 84-inches to 120-inches. The overall length of the system is approximately 4,350-feet. This pipe system serves as the outfall for a large drainage basin within a very prominent area of the City of Aurora, including the Town Center at Aurora and the Aurora Municipal Center. Given the high imperviousness of the development basin, the discharges upstream of the outfall system have the potential to exceed the system capacity. This, in combination with complicated flow splits and detention characteristics necessitated the need for a dynamic storm sewer model utilizing the EPA SWMM 5 program.Three phases of inspection, sampling, and testing were completed on the existing outfall pipe system. These phases will be discussed in detail in the final paper.This past year Aurora Water elected to pursue relining of 3,060-feet of pipeline within the existing 120-inch CMP. As expected, many obstacles were encountered in the final design phase, with the most prominent being limitations regarding pipe insertion and surface access. Construction for the relining project is anticipated to begin in December 2009.In summary, the final paper will cover the 120-inch CMP from the initial inspection to determine its present condition (extensive corrosion) through the construction of the relining in the winter of 2009/2010.
机译:2007年,ICON Engineering,Inc.与Aurora Water开始了一个项目,以研究和评估科罗拉多州Aurora市的大直径波纹金属管(CMP)排水系统。该项目的初始阶段着重于将现有的水力容量与城市化流域的预期排放量进行比较,并评估管道的结构完整性。随后的阶段包括衬砌系统的设计和建造。为了完成项目任务和目标,采用了多种方法,包括:雨水管道的动态SWMM分析;机械手和动手管道检查;最后的设计,在现有的CMP系统中完成衬砌。 市中心排污口系统建于1974年,大小从84英寸到120英寸不等。系统的总长度约为4,350英尺。该管道系统是Aurora市非常突出的区域内大型排水盆地的排污口,包括Aurora的Town Center和Aurora Municipal Center。鉴于开发盆地的高度不透水性,排污系统上游的排放量有可能超过系统容量。结合复杂的分流和滞留特性,需要使用EPA SWMM 5程序的动态雨水排放模型。 在现有的排水管系统上完成了检查,采样和测试的三个阶段。这些阶段将在最终论文中详细讨论。 去年,Aurora Water选择在现有的120英寸CMP内重新铺设3,060英尺的管道。正如预期的那样,在最终设计阶段遇到了许多障碍,其中最突出的是关于管道插入和表面进入的限制。衬砌项目的建设预计于2009年12月开始。 总而言之,最终论文将涵盖从最初的检查到确定其当前状态(广泛腐蚀)的120英寸CMP,直至2009/2010年冬季的衬砌施工。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号