【24h】

Risk Assessment Visualization Study for Lunar Outpost Landing Zone Surface Preparation

机译:月球前哨着陆区表面准备的风险评估可视化研究

获取原文

摘要

Landing zone surface preparation is one of the first teleoperated remote lunar construction activities to occur in NASA's plans for the buildup of a lunar outpost. This paper describes a risk assessment visualization study performed for a lunar out-post landing/launch pad excavation and construction scenario. A Visualization Analysis Sequencing Technique (VAST~(TM), developed by XArc Corp, was applied to the risk assessment. VAST~(TM) provides visual "snapshots" of the sequence of an op-erational process simulated over time to drive out and understand complex variables in systems planning. Presented is an illustrated sequence of the outpost buildup with pictorials of mission snapshots to play out the operational scenario and visualize the sequence of risks along the way to how the prepared landing zone gets to its ready state in time for arrival of the next crewed Altair lunar lander. The study identified and ranked operational risks according to risk matrix priority scoring using Constella-tion Program criteria for risk consequence scoring. Recommended mitigation strate-gies are discussed.
机译:着陆区表面准备工作是NASA建造月球前哨基地计划中最早进行的远程遥控月球建设活动之一。本文介绍了针对月球出站后着陆/发射台开挖和施工场景进行的风险评估可视化研究。由XArc Corp开发的可视化分析排序技术(VAST〜(TM))被用于风险评估,VAST〜(TM)提供了随时间推移模拟的操作过程序列的可视化“快照”,以驱逐并消除理解系统规划中的复杂变量,呈现出前哨基地建设的图解顺序,并附有任务快照的图像,以展现操作场景并可视化风险顺序,以及准备好的着陆区如何及时到达其就绪状态,本研究使用星座计划标准对风险后果进行评分,并根据风险矩阵优先级评分对操作风险进行了识别和分级,并讨论了建议的缓解策略。

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号