WATER HAMMER AND COLUMN SEPARATION DUE TO ACCIDENTAL SIMULTANEOUS CLOSURE OF CONTROL VALVES IN A LARGE SCALE TWOPHASE FLOW EXPERIMENTAL TEST RIG

机译:大型两相流实验台中控制阀的意外同时关闭导致水锤和色谱柱分离

获取原文

摘要

A large-scale pipeline test rig at Deltares, Delft, The Netherlands has been used for filling and emptying experiments. Tests have been conducted in a horizontal 250 mm diameter PVC pipe of 258 m length with control valves at the downstream and upstream ends. This paper investigates the accidental simultaneous closure of two automatic control valves during initial testing of the test rig. The simultaneous closure of both valves has induced upsurge and downsurge at the same time. Large water hammer and column separation have caused failure of pipe supports and leakage at pipe joints. The incident was caused by a fault in an electronic conversion box due to power failure. Afterwards the downstream end automatic valve has been modified to a manually operated valve to avoid the accidental simultaneous closure of the valves. The accidental transient event has been fully recorded with pressures, flow rates and water levels. The measurements of the accident are presented, analyzed and discussed in detail. Photographs show the damages to the system.
机译:位于荷兰代尔夫特(Delft)的德尔塔雷斯(Deltares)的大型管道试验台已经用于填充和排空实验。在水平的250mm直径,长度为258m的PVC管中进行了测试,并在下游和上游端安装了控制阀。本文研究了在试验台的初始测试过程中两个自动控制阀的意外同时关闭。两个阀门的同时关闭已同时引起潮涌和潮涌。大量的水锤和色谱柱分离会导致管道支撑失效以及管道接头泄漏。该事件是由于电源故障导致电子转换箱发生故障而引起的。之后,将下游端自动阀修改为手动阀,以避免意外同时关闭阀。意外瞬态事件已被完整记录下来,包括压力,流量和水位。详细介绍,分析和讨论了事故的测量方法。照片显示了系统损坏。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号