首页> 外文会议>ASME international pipeline conference;IPC2010 >Innovative Management Strategies to Address Environmental and Social Concerns on a Major Pipeline
【24h】

Innovative Management Strategies to Address Environmental and Social Concerns on a Major Pipeline

机译:解决主要管道环境和社会问题的创新管理策略

获取原文

摘要

Gasoducto Nor Andino is a 1,100 km long natural gas pipeline which runs through one of the most critical environmental and social areas of Argentina and Chile.The area is inhabited by aboriginal communities that face a progressive deterioration of their cultural values and traditional customs. The beginning of the construction of Gasoducto Nor Andino triggered a strong reaction in the local communities and environmental organizations such as Greenpeace. Such reaction soon extended throughout the country, generating a strong debate as to the value of Economic & Technological Progress vs Environmental Conservation. All the problems were successfully solved by actions conducted in accordance with the Company's ethical values. The different stakeholders involved were called together and agreements were implemented with nongovernmental organizations (NGOs), such as Greenpeace, representatives of the aboriginal communities, local and environmental authorities (National Park Administration, Environmental Secretariat of Salta Province, etc.). This paper describes the non-traditional and innovative actions taken to solve the problems and the remarkable results achieved.
机译:Gasoducto Nor Andino是一条长达1100公里的天然气管道,贯穿阿根廷和智利最关键的环境和社会区之一,该地区居住着原住民社区,这些社区的文化价值和传统习俗日益恶化。 Gasoducto Nor Andino的兴建之初在当地社区和绿色和平组织等环境组织中引起了强烈反响。这种反应很快在全国范围内蔓延,引发了关于经济与技术进步与环境保护的价值的激烈辩论。通过按照公司的道德价值观采取的行动,成功解决了所有问题。召集了不同的利益相关者,并与绿色和平组织,土著社区代表,地方和环境主管部门(国家公园管理局,萨尔塔省环境秘书处等)等非政府组织(NGOs)签署了协议。本文介绍了解决问题所采取的非传统和创新措施以及取得的显著成果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号