Practical Experience with Development and Implementation of Effective Construction Monitoring Plans

机译:有效建设监测计划的开发和实施实践经验

获取原文

摘要

Dams and levees during construction may pose as much, if not more risk, than during normal operation. Michael Baker and the Ohio Department of Natural Resources (ODNR) previously presented on the Ohio statewide Construction Monitoring Plan (CMP) Template, which summarized monitoring, communication, and response protocols during construction. This paper provides valuable insights and updates to CMPs based on actual storm events encountered during recent dam construction projects; including parameters and conditions to be considered in the monitoring of the project, the importance of updating the CMP for changing construction phases as construction advances, and providing clearly-defined communication protocols. CMPs are utilized during construction to determine action levels based on actual or forecasted precipitation quantities, lake levels, and the approved water control plan. Other factors, such as the quantity and quality of information available regarding the condition of the project and the integrity of water control measures and related infrastructure also play a key part in the CMP decision making process. In several recent construction projects, monitoring frequencies were escalated when inspection data was limited or worsening conditions were anticipated such as inclement weather. At one project, site inspections performed during a CMP event revealed the presence of an active seep at the interface of a concrete floodwall and an earthen berm. Through the implementation of the CMP, action levels were elevated, all parties were identified of the problem, and the contractor was directed to perform all necessary remedial efforts to repair the earthen berm. CMPs must be adaptable for all phases of construction, site conditions, and potential failure modes. An example of the adaptation of the CMP to account for multiple phases of construction was represented in a dam construction project that included an initial controlled embankment breach, conveyance of flows through unfinished labyrinth spillway wall sections, and temporary diversion through the completed control tower. Each phase had distinct action levels and potential failure modes that were incorporated in the phase-specific CMP. Communication between the contractor, engineer, owner, and regulator is an extremely important aspect of the CMP. Based on implementation of CMPs on completed projects, the CMP needs to clearly define the method of communication and the template for notifying all stakeholders.
机译:在施工期间的水坝和堤坝可能会造成比在正常运行期间的风险不多。 Michael Baker和俄亥俄州的自然资源部(ODNR)以前展示在俄亥俄州州各方建筑监测计划(CMP)模板上,总结了在建设期间的监测,通信和响应协议。本文为基于最近在最近的大坝建设项目期间遇到的实际风暴事件提供了有价值的见解和更新;包括在监控项目中考虑的参数和条件,更新CMP以将建筑阶段更改为建设进步的重要性,并提供明确定义的通信协议。在施工期间使用CMP来确定基于实际或预测降水量,湖泊等级和批准的水控制计划的动作水平。其他因素,如关于项目条件的信息的数量和质量以及水控制措施的完整性和相关基础设施也在CMP决策过程中发挥关键部分。在最近的几个建筑项目中,当检查数据受到限制或预期恶化的情况时,监测频率被升级,例如恶劣天气。在一个项目中,在CMP事件期间执行的站点检查显示在混凝土洪水墙壁和土坯的界面处存在活跃的渗透。通过实施CMP,行动水平升高,所有各方都被确定了问题,并举办了承包商,旨在履行修复土坯的所有必要补救措施。 CMP必须适用于构建,场地条件和潜在故障模式的所有阶段。 CMP为多个阶段进行调整的示例在包括初始受控路堤泄露的大坝建设项目中表示,通过未完成的迷宫溢洪道墙体部分,通过完成的控制塔进行临时转移。每相具有不同的作用水平和潜在的衰竭模式,其掺入相位特异性CMP中。承包商,工程师,所有者和监管机之间的沟通是CMP的一个极其重要的方面。基于完成项目的CMPS的实施,CMP需要清楚地定义通信方法和用于通知所有利益相关者的模板。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号